The management organisation was created to take on the management of the Wolverhampton City Council housing stock.
We are pleased to announce we have recently retained a large contract at Barking Power Station.
This project consisted of a phased refurbishment of a five storey office building in Central Birmingham, Adept were instructed to reinstall the Fire Alarm, Disabled Refuge systems and WC alarms.
A Forge Master was suffering from a spate of high value thefts of a variety of materials ranging from Carbon Steels, including Super Alloys and specialised Non Ferrous Alloys.
The Grade 2 Listed Building was originally opened in 1926 & called the Bath Assembly Hall & was typical of the1920s Art Deco Style. The Vision to reopen the building came in 2006. Following a period of renovation & design by Laurence Llewelyn Bowen, to recreate its Art Deco origins as it was originally intended.
Page 1 of 2
«StartPrev12NextEnd»